128
External blocking and fault message input
Code
Input DE1
3A:4
Input DE2
3b:4
Input DE3
3C:4
The effect on the internal circulation pump is selected
in coding address "3E" in the
"General"
group.
The effect on the relevant heating circuit pump is
selected in coding address "d6" in the
"Heating cir-
cuit"
group.
External demand
The "External demand" function is implemented via the
EA1 extension. There are 3 inputs available at the EA1
extension (DE1 to DE3).
The function is selected via the following coding
addresses in the
"General"
group:
External demand
Code
Input DE1
3A:2
Input DE2
3b:2
Input DE3
3C:2
The effect on the internal circulation pump is selected
in coding address "3F" in the
"General"
group.
The effect on the relevant heating circuit pump is
selected in coding address "d7" in the
"Heating cir-
cuit"
group.
The set minimum boiler water temperature for external
demand is selected in coding address "9b" in the
"General"
group.
Venting program
During the venting program, the circulation pump will
be alternately switched on and off for 30 s over a
period of 20 min.
The diverter valve alternates between heating and
DHW heating for a given time. The burner is switched
off during the venting program.
Activating the venting program: See "Venting the heat-
ing system".
Fill program
In the delivered condition, the diverter valve is set to its
central position, enabling the system to be filled com-
pletely. After the control unit has been switched on, the
diverter valve no longer goes into its central position.
Afterwards, the diverter valve can be moved into the
central position via the fill function (see "Filling the
heating system"). In this position, the control unit can
be switched off and the system can be filled com-
pletely.
Filling with the control unit switched on
If the system is to be filled with the control unit
switched on, the diverter valve is moved to its central
position in the fill program, and the pump starts.
When the function is enabled, the burner shuts down.
The program automatically becomes inactive after
20 min.
Screed drying
When activating screed drying, observe the informa-
tion provided by the screed manufacturer.
When screed drying is activated, the heating circuit
pump for the heating circuit with mixer starts and the
flow temperature is maintained in accordance with the
selected profile. On completion (30 days), the heating
circuit with mixer is regulated automatically according
to the set parameters.
Function description
Control functions
(cont.)
5773 216 GB
Functions
Содержание B2TA
Страница 12: ...12 2 5 1 4 2x 3 Fig 5 Installing the boiler Removing the front panels 5773 216 GB Installation ...
Страница 13: ...13 1 2 SW17 Fig 6 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation ...
Страница 23: ...23 4 1 5 2 2x 3 Fig 16 Installing the boiler Fitting the front panels 5773 216 GB Installation ...
Страница 101: ...101 Parts lists Overview of assemblies 5773 216 GB Components ...
Страница 107: ...107 Parts lists Hydraulics 5773 216 GB Components ...
Страница 118: ...118 0004 0002 0005 0006 0001 0003 Fig 77 Parts lists Miscellaneous 5773 216 GB Components ...
Страница 142: ...142 5773 216 GB ...
Страница 143: ...143 5773 216 GB ...