Installation 3
VES, LLC
Elite-RS Panel Installation Manual
VF3529-00, Revision E01.03
H-Series
16 of 146
This section provides instructions for connecting cables, mounting and testing the Elite-RS Panel for installation.
General Installation Checklist
To complete the installation:
1
Create a plan of the fire alarm system and checklist for installing the Elite-RS Panel.
2
Determine the current draw of the fire alarm system.
3
Determine the battery capacity of the Elite-RS Panel.
4
Remove the Elite-RS Panel from its packaging and check its contents.
5
Remove the standy-batteries from the base of the cabinet.
6
Mark the location for anchoring the cabinet to the premises-wall.
7
Anchor the cabinet of the Elite-RS to the premises-wall.
8
Thread cabling into the cabinet and secure it.
9
Place standby-batteries in the base of the empty-cabinet.
10
Attach the cabinet-door and the front-panel to the cabinet.
11
Connect the standby-batteries to the terminal-connection on the front-panel.
12
Connect all cabling.
13
Apply power to the Elite-RS Panel from the AC source.
14
Configure the Elite-RS Panel.
15
Test the Elite-RS Panel installation.
CAUTION!
Maintain extreme care when anchoring the cabinet and its contents to the premises wall.
Electronic components within the Elite-RS Panel are vulnerable to physical damage from severe
shock and vibration. Remove the cabinet-door and front-panel from the cabinet when installations
cannot guarantee vigilant care during the wall-anchoring process.
Section 3
Installation