Making Equipment Grounding Connections
NOTE!
Make equipment grounding connections to earth ground,
not
to the branch circuit neutral
conductor.
1.
Connect AC input equipment grounding leads to the frame ground studs using installer-provided ring
lugs and factory-supplied mounting hardware. Recommended torque is 23 in-lbs.
Reinstalling Covers
1.
After all AC input and equipment grounding connections have been made and checked, reinstall the two
AC input connector covers and the AC input wireway covers. Secure each by tightening the fasteners.