Vertiv
|
NetSure 710 Series Installation Manual (IM581127000)
|
Rev. U
100
Figure 46:
List AL and List AN: +24V Distribution Panel, (26) Bullet/TPS/TLS Circuit Breaker/Fuse Positions
Figure 47:
List AM and List AP: +24V Distribution Panel, (12) GJ/218 Circuit Breaker Positions
+24 VDC Load
Connections
Observe proper
polarity when making
load connections.
WARNING!
Load Return
Connections
LOAD AND LOAD RETURN CONNECTIONS
1/4-20 Studs on 5/8” Centers
(Customer must supply or
order additional hardware)
Maximum Lug Width: 0.625 inches.
Return Busbar
(not included with List AN)
Caution: A 100 A circuit breaker or fuse SHALL HAVE an empty
mounting position between it and any other overcurrent protective device.
A 175 A or greater circuit breaker SHALL HAVE an empty mounting
position between it and any other overcurrent protective device.
+24 VDC Load
Connections
Load Return
Connections
LOAD AND LOAD RETURN CONNECTIONS
3/8-16 Captive Nuts on 1” Centers
(Customer must supply or order additional hardware)
Maximum Lug Width: 1.375 inches.
Return Busbar
(not included with List AP)
Observe proper
polarity when making
load connections.
WARNING!
Содержание NetSure 710 Series
Страница 10: ...Vertiv NetSure 710 Series Installation Manual IM581127000 Rev U 10 This page is intentionally blank...
Страница 141: ...Vertiv NetSure 710 Series Installation Manual IM581127000 Rev U 141 This page is intentionally blank...
Страница 142: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA IM581127000 RU 08 19...