Vertiv
|
NetSure 710 Series Installation Manual (IM581127000)
|
Rev. U
93
Figure 37:
Installing Converter Output Cables
Dual Voltage Distribution Panel
List DA (Lists DB, DC, and DD similar.)
Shorting Block if 4th shelf
has Converter Option.
If more than three shelves with the Converter Option
installed, connect / –48 / jumpers for the 4th shelf here.
Assembly order is: lug, 1/4" flat washer, 1/4" lock washer,
1/4-20 nut. Torque to 84 in-lbs. Note that a shorting block
will be factory installed in this distribution device position.
Connect / –48 / jumpers to an available landing here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 bolt.
Torque to 84 in-lbs.
Front
Connect / –48 / jumpers to an available landing here.
Assembly order is: lug, 1/4" flat washer,
1/4" lock washer, 1/4-20 bolt.
Torque to 84 in-lbs.
List DG
(Lists DE, DF, DH,
DJ, and DK similar.)
Rear
Lugs can be landed
back-to-back.
Содержание NetSure 710 Series
Страница 10: ...Vertiv NetSure 710 Series Installation Manual IM581127000 Rev U 10 This page is intentionally blank...
Страница 141: ...Vertiv NetSure 710 Series Installation Manual IM581127000 Rev U 141 This page is intentionally blank...
Страница 142: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA IM581127000 RU 08 19...