![background image](http://html.mh-extra.com/html/vds/69871-01/69871-01_operation-and-maintenance-manual_858283087.webp)
Marquee ACON Ultra Installation/Operation Guide
D-12
Subassembly Replacement
50. Install 3 washers each on BNCs 2 and 4.
CAUTION: The nuts and BNCs must not be
crossthreaded.
Install a nut on BNCs 2 and 4 and tighten nuts.
Note:
•
A 14mm or 9/16in deep socket fits in the space
available.
•
PCBs in 2ed and 3
rd
slots must have identical
bezel hardware.
51. Position the connector from the third PCB as shown.
52. Plug the connector into the second PCB.
Содержание 69871-01
Страница 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Страница 67: ......
Страница 75: ......