Marquee ACON Ultra Installation/Operation Guide
D-1
Appendix D
Subassembly Removal and Installation
Caution
:
This equipment is
ESD
sensitive.
Put on an ESD wrist strap and clip the ground strap to an unpainted spot on the chassis before
handling any PCBs.
Note
: This procedure includes cover removal and installation, and the removal and installation of several subassemblies.
It is suggested that you remove the cover, locate the steps covering the removal and installation of the faulty
subassembly, replace that subassembly, then replace the cover. Do only the steps required for whatever subassembly
has failed.
1.
To replace the hard drive:
2. Ensure that power to the server is OFF.
Put the key in the hard drive lock.
Turn the key counter-clockwise.
3. Lift the handle and pull the drive out.
4. Hard drive bay, drive removed.
5. Slide the hard drive into the bay.
Содержание 69871-01
Страница 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Страница 67: ......
Страница 75: ......