
Marquee ACON Ultra Installation/Operation Guide
D-2
Subassembly Replacement
6. When the drive is in all the way, press
the handle down to latch the drive in
the bay.
Turn the key clock-wise.
Apply power to the server and look for
a green power indicator light on the
lower right.
7.
For access to the internal subassemblies:
8. Remove the 4 screws holding the top
cover (2 each side).
9.
Slide the cover to the rear and lift up.
Note that front edge is under a lip.
10. Remove two screws that secure the
support bar.
Содержание 69871-01
Страница 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Страница 67: ......
Страница 75: ......