Marquee ACON Ultra Installation/Operation Guide
D-10
Subassembly Replacement
41.
To replace the frame grabber extension PCB in slot number 3:
42. On the PCB in slot number 3, remove the nuts from
BNCs 1 and 3.
Keep the nuts for installation.
Note: A 14mm or 9/16in deep socket fits in the space
available.
43. Remove a nut and 3 washers each from BNCs 2 and
4.
Keep the nuts and washers for installation.
Remove the bezel.
44. Locate the ribbon cable from the PCB in slot number 3
to the PCB in slot number 2.
Disconnect the connector from the PCB in slot
number 2.
45. Remove 1 screw, and carefully remove the PCB from
the slot.
Содержание 69871-01
Страница 2: ...VDCDS Doc 79024 01 Revision 2 0 2 07 30 2007 MARQUEE ACON Ultra Operation Maintenance Manual ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 19: ......
Страница 31: ...Marquee ACON Ultra Installation Operation Guide 2 8 AU User Controls Settings and Operation ...
Страница 67: ......
Страница 75: ......