7
Menus
First menu level – Standard values
80
Instruction manual DTCO 4.1 - Edition 02/2023 - BA00.1381.41 100 102
Requirement:
Correct entry of this
function:
Ferry / train: Enter start / end
At the latest after the end of the
driving time
(1)
,the daily rest time
must be continued.
VDO 02h19
00h45
Fig. 64:
Activity
– out of scope
(6)
The display of the remaining driving
time is active (
h
flashes), a count-
down takes place.
The VDO counter evaluates activ-
ity
as activity
IMPORTANT
Please note that the calculations of the
driving and rest times for the
VDO counter occur according to Regu-
lation (EC) 561/2006 and not according
to Implementation Regulation
(EU) 2016/799 Annex I C, as amended.
Therefore, there may be deviations
from the standard displays of the
DTCO 4.1.
VDO Counter – displays for rest
time activity
VDO 00h09
00h29 04h30
VDO 04h30
00h00
Fig. 65:
Activity
– rest time vs.
available driving test
(1)
Remaining rest time
(2)
Remaining driving time, if the rest
time
(1)
is not observed.
(3)
Period of the next available driving
time after the end of the rest time
displayed
(1)
.
(4)
Available driving time after a valid
rest time.
VDO 00h09
00h44 01h09
Fig. 66:
Activity
– rest time vs.
available daily driving time
(5)
Remaining rest time.
(6)
Length of the available daily driving
time after the end of the rest time
(5)
.
VDO 00h09
10h59 04h30
Fig. 67:
Activity
– daily rest time
(7)
Remaining daily rest period.
If permitted, split into 3 + 9 hours.
Содержание DTCO 4.1
Страница 1: ...www fleet vdo com Digital tachograph DTCO 4 1 Instruction manual for contractors and drivers...
Страница 13: ...For your safety Basic safety information Legal requirements Intended use 2...
Страница 74: ...Menus First menu level Standard values Second menu level menu functions 7...
Страница 117: ...Print Notes for printing Starting print Cancel print Replacing the printer paper Clear paper jam 9...
Страница 121: ...Printouts Retaining printouts Printouts examples Explanation to the printouts Data set for events or faults 10...
Страница 125: ...10 Printouts examples Printouts Continental Automotive Technologies GmbH 125...
Страница 127: ...10 Printouts examples Printouts Continental Automotive Technologies GmbH 127 Speeding events Technical data...
Страница 143: ...Maintenance and inspection obligation Cleaning Compulsory inspection 11...
Страница 150: ...Technical data DTCO 4 1 Paper roll 13...
Страница 153: ...Appendix Declaration of conformity Authorisations Optional accessories VDO online shop 14...
Страница 163: ...Change overview Release overview 15...
Страница 171: ......