2
40
Fig. 21
A
Lighting Circuit Test (WHITE Wire)
1. Insert RED test lead into
V
receptacle in meter.
2. Insert BLACK test lead into
COM
receptacle.
3. Rotate selector to
+
)
)
)
))
(DIODE TEST) position.
4. Attach RED test lead clip (1) to point A, of the
WHITE wire (3)
Fig. 22
. (It may be necessary to
pierce wire with a pin as shown.)
5. Insert BLACK test lead probe (2) into harness
connector.
a. If meter BEEPS once, diode is OK.
b. If meter makes a
CONTINUOUS TONE
,
diode is shorted. Replace harness.
c. If meter displays
OL
proceed to step 6.
6. Reverse test leads.
a. If meter
BEEPS
once, diode is installed
backwards. Replace harness.
b. If meter still displays
OL
diode is open.
Replace harness.
NOTE:
Service replacement diode harnesses are
available.
Fig. 22
A
5 & 9 Amp Regulated Alternator
The 5 & 9 amp regulated alternator systems provide
AC current through a single lead to the
regulator-rectifier. The regulator-rectifier converts the
AC current to DC and regulates current to the battery.
The charging rate will vary with engine RPM and
temperature.
Alternator output is determined by the flywheel
alternator magnet size. The stator and
regulator-rectifier are the same for the 5 & 9 amp
regulated system and the Tri-Circuit system.
Stator assembly (1),
Fig. 23
.
BLACK lead (2).
GREEN connector (3).
YELLOW wire (4).
RED connector (5).
Regulator-rectifier (6).
Fig. 23
Содержание OHV V-Twin
Страница 27: ...1 26...
Страница 113: ...4 112...
Страница 156: ...10 155 Section 10 Crankshafts and Camshafts Page INSPECT CAMSHAFT 156 INSPECT CRANKSHAFT 156 INSPECT FLYWHEEL 157...
Страница 159: ...10 158...
Страница 177: ...12 176...