4.7.3.5
Checking and greasing the front linkage
Check and grease the front linkage periodically.
•
Check regularly that all screws and nuts are tight.
1
GUID-57C69758-FE2F-4687-BB13-8A750A9C2B54
1. Screws and nuts
•
Tighten all screws and nuts of the front linkage after the first 15-25 running
hours.
•
Check that the hydraulic connections have no leaks.
4. Maintenance
- 324 -
Содержание T series Versu
Страница 1: ...OPERATOR SMANUAL TSERIES Versu Ref no 39 885 21 1 10 2014 YOUR WORKING MACHINE...
Страница 387: ...1 GUID AE82D857 4258 4575 8938 1506A5C211BE 1 Cab electric centre 4 Maintenance 386...
Страница 391: ...1 GUID 83BB3EC4 E4C8 4AB1 988E 6963318C0579 1 Relay K21 Location of relays K31 K33 and K40 4 Maintenance 390...