3.16.2
Setting front linkage lifting link positions
You can set the lifting links to different positions mechanically by changing the
positions of the fastening bolts.
CAUTION: When driving on public roads, with or without an
implement, always lift the front linkage fully up.
IMPORTANT: When using the front loader, the front linkage lifting links must be
folded to the transport position.
3
2
1
GUID-631FF889-19C9-4135-895A-0B846D5BAC68
1. Fastening hole 1
2. Fastening hole 2
3. Fastening hole 3
Lifting link position
Fastening bolt location
Working
Fastening bolts are fitted in holes 1 and 2 or 1 and 3.
Transport
Lifting links are folded fully up and fastening bolts are fitted
in holes 1 and 3.
Floating
Fastening bolt is fitted in hole 1 only.
NOTE: When using the mechanical floating position, the
maximum load on the ball hitch couplers is 25 KN.
•
Check that the locking pins of the fastening bolts are in their positions when
the lifting links are mounted.
•
When you drive on public roads and there is an implement on the front
linkage covering the headlights, switch the upper headlights on (optional
equipment).
3. Operation
- 227 -
Содержание T series Versu
Страница 1: ...OPERATOR SMANUAL TSERIES Versu Ref no 39 885 21 1 10 2014 YOUR WORKING MACHINE...
Страница 387: ...1 GUID AE82D857 4258 4575 8938 1506A5C211BE 1 Cab electric centre 4 Maintenance 386...
Страница 391: ...1 GUID 83BB3EC4 E4C8 4AB1 988E 6963318C0579 1 Relay K21 Location of relays K31 K33 and K40 4 Maintenance 390...