30A168
G.
OPTIONAL COOK COMPUTER
1. TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 11 Cooking Computer, use the
procedures contained in the “Ultrastat 11 Gas Fryer Computer Operation Instruction”, PN 30A053, provided
with the fryer.
2. TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 25 Cooking Computer, use the
procedures contained in the “Ultrastat 25 Gas Fryer Computer Operation Instruction”, PN 30A051, provided
with the fryer.
3. TO TEST OPERATE
a Ultrafryer Gas Fryer equipped with an Ultrastat 21 Cooking Computer, use the
procedures contained in the “Ultrastat 21 Gas Fryer Computer Operation Instruction”, PN 30A009, provided
with the fryer.
H.
INITIAL CLEANING -
New fryers are wiped clean at the factory to remove any visible signs of dirt, oil, grease, etc.,
remaining from the manufacturing process. Each fryer and filter system should be
THOROUGHLY
washed with
HOT
sanitizer solution to remove film residues, installation dust or debris and then wiped dry prior to placing the
fryer in operation.
I.
COOKING :
Most products should be cooked with a shortening temperaure about 350˚F (177˚C); however, each
product should be cooked at the
LOWEST
temperature that produces a high quality product while obtaining maxi-
mum usage of the shortening.
DO USE A HIGH QUALITY SHORTENING TO ACHIEVE A CONSISTENT QUALITY PRODUCT AND
LONG TERM SAVINGS.
DO NOT SALT PRODUCTS OVER THE FRYER AS SALT QUICKLY DETERIORATES THE SHORTENING
AND FLAVORS OTHER PRODUCTS COOKED IN THE SAME SHORTENING.
DO FILTER SHORTENING AFTER THE LUNCH AND DINNER RUSH AND MORE OFTEN IN A HIGH
SALE VOLUME STORE; AND BOIL-OUT THE FRYER EVERY 7 DAYS.
Page 17 of 56
Содержание F-P20-18
Страница 5: ...30A168 GENERAL INFORMATION Page 1 of 56...
Страница 11: ...30A168 PRE INSTALLATION Page 7 of 56...
Страница 13: ...30A168 RECEIVING INSTALLING Page 9 of 56...
Страница 18: ...30A168 INITIAL START UP Page 14 of 56...
Страница 22: ...30A168 ABBREVIATED OPERATING INSTRUCTIONS Page 18 of 56...
Страница 24: ...30A168 ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 56...
Страница 26: ...30A168 PREVENTIVE MAINTENANCE TROUBLESHOOTING Page 22 of 56...
Страница 29: ...30A168 CLEANING Page 25 of 56...
Страница 34: ...30A168 FRYER OPERATION Page 30 of 56...
Страница 37: ...30A168 FILTER TUB ASSEMBLY INSTALLATION Page 33 of 56...
Страница 39: ...30A168 FILTERING POLISHING SHORTENING Page 35 of 56...
Страница 42: ...30A168 SHORTENING BOIL OUT DISPOSAL INSTALLATION Page 38 of 56...
Страница 46: ...30A168 TECHNICAL ASSISTANCE ORDERING INFORMATION Page 42 of 56...
Страница 48: ...30A168 RECOMMENDED SPARE PARTS Page 44 of 56...
Страница 50: ...30A168 PARTS IDENTIFICATION Page 46 of 56...
Страница 52: ...30A168 ULTRAFRYER MODEL PAR 3 H GAS FRYER FRONT VIEW Page 48 of 56...
Страница 59: ...30A168 WIRING DIAGRAMS Page 55...