30A168
2.
SOLID SHORTENING:
a. Cut a block of solid shortening into small pieces.
b. Place small pieces of solid shortening
EVENLY
on top of the
HEAT EXCHANGER TUBES
or
THOROUGHLY PACK
these pieces of solid shortening between, below and above the
HEAT EXCHANGER TUBES.
While packing solid
shortening is messy and time consuming, it is the safest and fastest way to melt solid shortening.
c. DTMR equipped Fryer
1) Turn the fryer Toggle
ON/OFF
switch
ON
; then place the Default-to-Manual-Restart (DTMR) Control in the
SHORTENING MELT MODE
by depressing then releasing the momentary
START
button on the DTMR. The
RED START
lamp and
AMBER MELT MODE
lamp will light to indicate the fryer is in the melt mode.
2) When the
HEAT EXCHANGER TUBES
are
COMPLETELY
covered with
HEATED
LIQUID
shortening, replace
the grill in the fryer vat; then push the
EXIT MELT
button on the DTMR and proceed to paragraph d below.
d. Continue adding solid shortening as follows:
1) Place small pieces of solid shortening into a fry basket.
2)
CAREFULLY
lower the basket into the fryer vat.
3)
GENTLY
turn the basket to allow these ieces of solid shortening to float away.
4) Repeat the above steps until liquid shortenng is even with the middle line of the
“E”
in the word
LEVEL
of the shortening level mark on the rear wall of the fryer vat.
Page 41 of 56
Содержание F-P20-18
Страница 5: ...30A168 GENERAL INFORMATION Page 1 of 56...
Страница 11: ...30A168 PRE INSTALLATION Page 7 of 56...
Страница 13: ...30A168 RECEIVING INSTALLING Page 9 of 56...
Страница 18: ...30A168 INITIAL START UP Page 14 of 56...
Страница 22: ...30A168 ABBREVIATED OPERATING INSTRUCTIONS Page 18 of 56...
Страница 24: ...30A168 ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 56...
Страница 26: ...30A168 PREVENTIVE MAINTENANCE TROUBLESHOOTING Page 22 of 56...
Страница 29: ...30A168 CLEANING Page 25 of 56...
Страница 34: ...30A168 FRYER OPERATION Page 30 of 56...
Страница 37: ...30A168 FILTER TUB ASSEMBLY INSTALLATION Page 33 of 56...
Страница 39: ...30A168 FILTERING POLISHING SHORTENING Page 35 of 56...
Страница 42: ...30A168 SHORTENING BOIL OUT DISPOSAL INSTALLATION Page 38 of 56...
Страница 46: ...30A168 TECHNICAL ASSISTANCE ORDERING INFORMATION Page 42 of 56...
Страница 48: ...30A168 RECOMMENDED SPARE PARTS Page 44 of 56...
Страница 50: ...30A168 PARTS IDENTIFICATION Page 46 of 56...
Страница 52: ...30A168 ULTRAFRYER MODEL PAR 3 H GAS FRYER FRONT VIEW Page 48 of 56...
Страница 59: ...30A168 WIRING DIAGRAMS Page 55...