30A168
A. UNPACKING:
Check that the container is upright. Use an outward prying motion –
DO NOT USE A HAMMER
- to remove the
carton. Check the fryer for visible damage; if such damage has occurred do not refuse shipment, but contact the carrier and file
the appropriate freight claims.
B. INSTALLING:
Roll the assembled fryer into the building, to it’s operating location.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE
PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE
INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
C. LEVELING:
1. When the fryer is placed in its operating location check to be sure it is level. If not, loosen the casters and insert the appropri
ate number of shim plates between leg and caster plates then retighten the caster bolts.
2. If the floor is smooth and level, adjust to the high corner and measure with a spirit level. If the floor is uneven or has a
decided slope, level the unit with metal shims.
NOTE:
A caster may not return exactly to the same position after being moved, which may require re-leveling after each move.
3. Connect the gas manifold to the building gas supply line by means of a CSA International APPROVED flexible gas line as
shown in the figure below.
NOTE:
CONNECT-IT inc. 3⁄4" (19mm), 1" (25mm) and 1 1⁄4" (32mm) flexible gas hose 4 feet long (1219mm) with a quick
disconnect coupling on one end is available from Ultrafryer Systems under PN 24322 (3⁄4" (19mm) hose), PN 24323
(1" (25mm) hose) and PN 24456 (1 1⁄4" (32mm) hose). These hoses are euipped with a fusible link, which melts at
361°F (183ºC)
that will
SHUT OFF
the gas supply when it melts. A 44" (1119mm) long restraining device is also
available under PN 24324.
CAUTION: THE BUILDING GAS SUPPLY LINE MUST BE SIZED TO PROVIDE THE VOLUME OF GAS REQUIRED FOR
PROPER OPERATION AS EXPLAINED ON THE PREVIOUS PAGE.
WARNING: THE RESTRAINT DEVICE (ITEM 9) MUST BE INSTALLED TO ASSURE TENSION CANNOT BE PLACED ON
THE FLEXIBLE GAS LINE OR FITTING.
1. BUILDING GAS SERVICE LINE
6. APPLIANCE MANIFOLD/NIPPLE
2. MAIN GAS CUT-OFF VALVE
7. EYELET FASTENERS
3. CONNECT-IT QUICK-DISCONNECT
8. SPRING HOOK
4. FLEX-CON CONNECTOR
9. RESTRAINING CHAIN
TYPICAL GAS CONNECTION
Page 10 of 56
Содержание F-P20-18
Страница 5: ...30A168 GENERAL INFORMATION Page 1 of 56...
Страница 11: ...30A168 PRE INSTALLATION Page 7 of 56...
Страница 13: ...30A168 RECEIVING INSTALLING Page 9 of 56...
Страница 18: ...30A168 INITIAL START UP Page 14 of 56...
Страница 22: ...30A168 ABBREVIATED OPERATING INSTRUCTIONS Page 18 of 56...
Страница 24: ...30A168 ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 56...
Страница 26: ...30A168 PREVENTIVE MAINTENANCE TROUBLESHOOTING Page 22 of 56...
Страница 29: ...30A168 CLEANING Page 25 of 56...
Страница 34: ...30A168 FRYER OPERATION Page 30 of 56...
Страница 37: ...30A168 FILTER TUB ASSEMBLY INSTALLATION Page 33 of 56...
Страница 39: ...30A168 FILTERING POLISHING SHORTENING Page 35 of 56...
Страница 42: ...30A168 SHORTENING BOIL OUT DISPOSAL INSTALLATION Page 38 of 56...
Страница 46: ...30A168 TECHNICAL ASSISTANCE ORDERING INFORMATION Page 42 of 56...
Страница 48: ...30A168 RECOMMENDED SPARE PARTS Page 44 of 56...
Страница 50: ...30A168 PARTS IDENTIFICATION Page 46 of 56...
Страница 52: ...30A168 ULTRAFRYER MODEL PAR 3 H GAS FRYER FRONT VIEW Page 48 of 56...
Страница 59: ...30A168 WIRING DIAGRAMS Page 55...