30A168
B. SAFETY
The major safety concern associated with the Ultrafryer Gas Fryer is burns from hot shortening. In order to prevent
serious burns, good houskeeping habits are required. The floor in front of and the area around the fryer should be kept
clean and dry. Whenever anything is placed in to a fryer vat, care should be used not to splash the hot shortening.
Product should always be “
PLACED”
into the shortening,
NOT THROWN.
Safety googles, neoprene insulated gloves and
an apron must be worn while filtering or boiling-out a fryer vat. Electrical controls on all Ultrafryer Fryers operate on
120 volts single phase electrical power. No adjustments or replacement of electrical controls should ever be attempted
without first disconneting electrical power. The fryer should never be operated with wet hands or while standing in water.
To do so can result in serious electrical shock or death.
C. DESCRIPTION / SPECIFICATIONS
The Ultrafryer Gas Fryer is constructed from 16 & 18 gauge, type 304 polished satin finish stainless steel. Most Models
are equipped with a Default-To-Manual-Restart (DTMR) Control or an Ultrastat 11 Cooking Computer; however ,
customers may request the fryer be equipped with an Ultrastat 21 or Ultrastat 25 Cooking Computer. In addition, the
Model PAR-3-H is equipped with the
NEWLY
developed EZ Dock Filtration System that uses a stainless steel Filter
Screen. The Customer has the option of ordering a Magnepad Filter Screen that uses a Magnesol impregnated Filter Pad
in lieu of the S/S filter screen. The dimensions specification and gas rating of the 14" Model PAR-3-H Gas Fryer are as
follows:
D. ULTRAFRYER MODEL PAR-3-H GAS FRYER DIMENSIONS & OPERATIONAL REQUIREMENTS
SPECIFICATION ITEM
14" PAR-3-H
Overall Width
15 5/8" (397 mm)
Overall Depth
25 1/4" (641 mm)
Work Height
35 3/4" (908 mm)
Oil Capacity High Level
Low Level
35 Lbs (17.5 Liters)
45 Lbs (22.5 Liters)
Size Vat Container
14" x 14" (356 x 356 mm)
Gas Valve Pressure Butane Gas
Natural Gas
Propane Gas
10.0" (254 mm) W.C.
4.0" (102 mm) W.C.
10.0" (254 mm) W.C.
Orifice Drill Size Butane Gas
Natural Gas
Propane Gas
# 36
# 16
# 32
Gas Rating Butane Gas
Natural Gas
Propane Gas
90,000 BTU/hr (95 MJ/hr)
90,000 BTU/hr (95 MJ/hr)
90,000 BTU/hr (95 MJ/hr)
Inlet Flow Required Butane Gas
At STP Natural Gas
Propane Gas
28 FT
3
/hr (.8 M
3
/hr)
90 FT
3
/hr (2.5 M
3
/hr)
36 FT
3
/hr (1.0 M
3
/hr)
Shipping Cube
9.0 FT
3
(.26 M
3
)
Shipping Weight
215 lbs (113 kgs)
Power Input
120 Volt 6 Amp 60 Hz 1 Ø
NOTE:
TEST START-UP, OPERATIONS, COOKING, FILTERING, AND BOIL OUT PROCEDURES OF A 14" MODEL PAR-3-H
GAS FRYER IN THIS MANUAL ARE BASED ON A DEFAULT-TO-MANUAL-RESTART (DTMR) CONTROL . REFER TO
MANUAL PN 30A053, ULTRASTAT 11 COOKING COMPUTER OPERATOR INSTRUCTIONS; OR MANUAL PN 30A009,
ULTRASTAT 21 COOKING COMPUTER OPERATOR INSTRUCTIONS; OR MANUAL PN 30A051, ULTRASTAT 25
COOKING COMPUTER OPERATION INSTRUCTIONS TO PERFORM THESE FUNCTIONS IF A PAR-3-H FRYER WITH
A COOKING COMPUTER OTHER THAN THAT LISTED IN THIS MANUAL.
Page 3 of 56
Содержание F-P20-18
Страница 5: ...30A168 GENERAL INFORMATION Page 1 of 56...
Страница 11: ...30A168 PRE INSTALLATION Page 7 of 56...
Страница 13: ...30A168 RECEIVING INSTALLING Page 9 of 56...
Страница 18: ...30A168 INITIAL START UP Page 14 of 56...
Страница 22: ...30A168 ABBREVIATED OPERATING INSTRUCTIONS Page 18 of 56...
Страница 24: ...30A168 ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 56...
Страница 26: ...30A168 PREVENTIVE MAINTENANCE TROUBLESHOOTING Page 22 of 56...
Страница 29: ...30A168 CLEANING Page 25 of 56...
Страница 34: ...30A168 FRYER OPERATION Page 30 of 56...
Страница 37: ...30A168 FILTER TUB ASSEMBLY INSTALLATION Page 33 of 56...
Страница 39: ...30A168 FILTERING POLISHING SHORTENING Page 35 of 56...
Страница 42: ...30A168 SHORTENING BOIL OUT DISPOSAL INSTALLATION Page 38 of 56...
Страница 46: ...30A168 TECHNICAL ASSISTANCE ORDERING INFORMATION Page 42 of 56...
Страница 48: ...30A168 RECOMMENDED SPARE PARTS Page 44 of 56...
Страница 50: ...30A168 PARTS IDENTIFICATION Page 46 of 56...
Страница 52: ...30A168 ULTRAFRYER MODEL PAR 3 H GAS FRYER FRONT VIEW Page 48 of 56...
Страница 59: ...30A168 WIRING DIAGRAMS Page 55...