30A168
F. TEST START-UP :
a.
TO TEST OPERATE
an Ultrafryer Gas Fryer equipped with a Default-to-Manual-Restart (DTMR) control:
1) Ensure the fryer’s Toggle ON/OFF Switch is in the
OFF
position.
2) Fill the fryer vat with hot or cold water to the middle of the
“E”
in the word
LEVEL
of the applicable shortening level
mark on the rear of the vat.
3) Turn the MANUAL gas valve to the
OFF
position and wait
FIVE
(5)
minutes for any accumulated gas to disperse.
4)
ENSURE
the
MAIN
gas shut-off valve is in the
ON
position, and that the Vent Hood
EXHAUST FAN
is
ON
.
5) Turn the MANUAL GAS VALVE to the ON position.
6) Perform the following steps, in the order listed:
ITEM
ACTION
DTMR CONDITION
1
ENSURE
the drain valve is in the CLOSED
position and that water is at the proper level; then
turn the Toggle ON/OFF switch to the
ON
position.
A.
AMBER
power lamp will
LIGHT
.
B.
BLUE READY
TO START lamp will
LIGHT.
CAUTION: PRIOR TO PROCEEDING TO STEP 2 VISUALLY CHECK THAT THE HEAT MECHANISM IS
COVERED WITH AT LEAST 2" (51 mm) OF WATER.
2
Depress, then release the momentary
START
button
A.
RED STARTED
lamp and
AMBER MELT
MODE
lamp will light.
B.
BLUE READY TO START
lamp will turn
OFF.
C. A
MELT CYCLE TIMING MODULE
in the
Default-To-Melt electrical circuit will begin cycling
the fryer heat mechanism
ON
for ten (12) seconds
and
OFF
for 28 seconds to safely heat the water.
CAUTION: PRIOR TO PROCEEDING TO STEP 3, VISUALLY CHECK THAT THE WATER
COMPLETELY COVERS THE HEAT MECHANISM.
3
When heated and water is above the heat tubes;
Depress, then release the momentary EXIT MELT
button.
A.
AMBER MELT MODE
lamp will turn
OFF
and
the
RED STARTED
lamp will remain lit.
B. The
MELT CYCLE TIMING MODULE
in the
Default-To-Melt circuit will switch to the
FULL ON
position, allowing the Electronic Thermostat to heat
water.
4
When the water begins to boil, turn the fryer
OFF
,
and after the water has
COOLED
drain the water
into a floor drain.
��� ������� ����
����� ����
���� ����
���� �����
�� �����
����
�����
������
���� ����
������
Page 16 of 56
Содержание F-P20-18
Страница 5: ...30A168 GENERAL INFORMATION Page 1 of 56...
Страница 11: ...30A168 PRE INSTALLATION Page 7 of 56...
Страница 13: ...30A168 RECEIVING INSTALLING Page 9 of 56...
Страница 18: ...30A168 INITIAL START UP Page 14 of 56...
Страница 22: ...30A168 ABBREVIATED OPERATING INSTRUCTIONS Page 18 of 56...
Страница 24: ...30A168 ELECTRONIC THERMOSTAT CALIBRATION Page 20 of 56...
Страница 26: ...30A168 PREVENTIVE MAINTENANCE TROUBLESHOOTING Page 22 of 56...
Страница 29: ...30A168 CLEANING Page 25 of 56...
Страница 34: ...30A168 FRYER OPERATION Page 30 of 56...
Страница 37: ...30A168 FILTER TUB ASSEMBLY INSTALLATION Page 33 of 56...
Страница 39: ...30A168 FILTERING POLISHING SHORTENING Page 35 of 56...
Страница 42: ...30A168 SHORTENING BOIL OUT DISPOSAL INSTALLATION Page 38 of 56...
Страница 46: ...30A168 TECHNICAL ASSISTANCE ORDERING INFORMATION Page 42 of 56...
Страница 48: ...30A168 RECOMMENDED SPARE PARTS Page 44 of 56...
Страница 50: ...30A168 PARTS IDENTIFICATION Page 46 of 56...
Страница 52: ...30A168 ULTRAFRYER MODEL PAR 3 H GAS FRYER FRONT VIEW Page 48 of 56...
Страница 59: ...30A168 WIRING DIAGRAMS Page 55...