22
5. Install float-type LWCO, if so equipped.
See Figures 5 and 9.
a. Install nipples and unions in "D" Tappings.
b. Mount hardware to low water cut-off body.
Install assembly.
c. Install water gage glass on low water cut-off
assembly's tee fittings.
6. Install Pressure Limit Control.
a.
Float LWCO only: Remove ¼" NPT plug from
top of Low Water Cut-Off. Install Syphon and
Limit into this tapping. See Figure 9.
b. Probe LWCO only: Install Limit in Tapping "A"
using ¾" NPT x 3" long nipple, ¾" NPT elbow,
¾" NPT x ¼" NPT bushing, and syphon. See
Figures 5 and 10.
c.
DO NOT
tighten the limit by holding the case;
apply a wrench to the brass hex below the case.
d. An L404F pressure limit does not require
leveling.
7. Connect the field wiring to the LWCO or the
R8239A Control Center/J-box, or burner disconnect
J-box.
a. If equipped with tankless heater, connect field
wiring from the aquastat control to the R8239A
Control Center transformer terminals or oil
burner primary control's "T-T" terminals.
Make the wiring connections as shown in
appropriate wiring diagram, refer to Figure 22,
23A, 23B, 24A or 24B.
Note: DO NOT
remove "T-T" jumper unless
wiring diagram indicates a direct connection
from thermostat and/or tankless heater aquastat
control to the oil burner primary control's "T-T"
terminals.
Also refer to Section XI, Paragraph I, Item 2,
"Verify Oil Primary Control" for more details.
b. Refer to Paragraph R for details on use of
burner disconnect junction box provided with all
knockdown boiler builds.
P. INSTALL TRIM AND CONTROLS WITH
CARLIN BURNERS.
Water boilers Only
(see Figures 1A, 1B, 1C and 5).
Follow instructions in Paragraph N, Steps 1 through 7.
Steam Boilers Only
(see Figures 1D and 5).
Follow instructions in Paragraph O, Steps 1 through 6.
7. Connect Field Wiring
a. Steam Boiler with Hydrolevel CG450 LWCO,
Carlin Burner.
Connect the field wiring to the R8239A Control
Center. If equipped with tankless heater, connect
field wiring from the aquastat control to the
R8239A Control Center’s “R-G” terminals.
Make the wiring connections as shown in
Figure 22.
b. Steam Boiler with McDonnell & Miller
PS-801 or McDonnell & Miller 67 LWCO,
Carlin Burner.
Connect the field wiring to the LWCO or the
burner disconnect J-box. If equipped with
tankless heater, connect field wiring from
the aquastat control to the oil burner primary
control’s “T-T” Terminals. Make the wiring
connections as shown in appropriate wiring
diagram, refer to Figure 23A, 23B, 24A or 24B.
Note: DO NOT
remove "T-T" jumper unless
wiring diagram indicates a direct connection
from thermostat and/or tankless heater aquastat
control to the oil burner primary control's "T-T"
terminals.
Also refer to Section XI, Paragraph I, Item 2,
"Verify Oil Primary Control" for more details.
SECTION III: KNOCKDOWN BOILER ASSEMBLY (continued)
Figure 9: Float-Type Low Water Cut-Off and
Pressure Limit Installation
Figure 10: Pressure Limit Installation for Probe
LWCO Equipped Boilers
Содержание V8H SERIES
Страница 76: ...76 Bare Boiler Assembly Continued SECTION XVI Repair Parts continued ...
Страница 78: ...78 Jacket Assembly SECTION XVI Repair Parts continued ...
Страница 80: ...80 V8H3 Thru V8H9 Steam Boilers Trim and Controls SECTION XVI Repair Parts continued ...
Страница 82: ...82 V8H3 Thru V8H9 Water Boilers Trim and Controls SECTION XVI Repair Parts continued ...
Страница 84: ...84 Beckett AFG Burner SECTION XVI Repair Parts continued ...
Страница 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 96: ...96 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...