Turner OCTO
®
Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland
Section 1 Page 8
TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.3 Components
4. Drive vertically until level
with the top of the Guardrail.
6. Lift the Wedge clear, rest on
ledge and lift Guardrail from cup.
1. Preset Guardrail by lifting
Wedge and resting it on ledge
within the Guardrail.
Note
Saddle will hang loosely leaving
space to fit hook into cup.
2. Locate top and bottom
hooks of Guardrail in cups
(0.5m apart).
Hint
Tap lower hook
with hammer to ensure that it is
properly located in cup.
3. Lift Wedge clear of ledge
within the Guardrail to the
Vertical position and allow to
drop and loosely engage.
Guardrails
Decks
2.
Ensuring that Deck fits
correctly in bay to be decked
out and there is no movement
in the Deck, lock in position.
1. Push Deck from below and
through bay, then slide back
along bay until the hooks are in
line with the Horizontal. Place
Deck onto Horizontal.
3. The OCTO
®
Deck has the
added benefit of being locked
permanently by fully engaging
the OCTO
®
Lock using the
appropriate OCTO
®
tool.
5. To de-mount Guardrail, drive
Wedge vertically upwards to
loosen.
Wedge
Ledge
Saddle
Cup
Unlocked
OCTO® Lock
Locked