![background image](http://html1.mh-extra.com/html/turner/octo/octo_assembly-manual_1182048038.webp)
Turner OCTO
®
Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland
Section 1 Page 38
TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
The following checks and procedures must be followed prior to and during all moves (refer
to Guidance notes):
TICK
( )
All structures and components are securely in place.
( )
All platforms have been checked and are clear of any debris and / or all loose items.
( )
All personnel are cleared from structure to be moved.
If it has been deemed necessary by the Client that personnel are required to be stationed
on board the structure to provide guidance whilst it is being moved then the following
checks are to be included.
( )
Design check has been requested.
( )
Temporary guardrails are in position.
( )
All brake locks are off prior to and during all movements of structure.
( )
All brake locks are on when structure is stationary and in required position (location).
( )
All protruding items are removed or protective measures deployed.
( )
Is structure to be stored outside?
If yes;
( )
All necessary measures have been taken to prevent movement when stored.
( )
All access to structure has been restricted when stored.
Signed…………………………………………. Date…………………
SECTION 1.5 Assembly Procedures