Turner OCTO
®
Assembly Guide
T: +44 (0) 141 309 5555 F: +44 (0) 141 309 5436 www.turner-octo.com
Section 1 Page 23
TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.4 Safety Information
1.4.3
Fall Arrest
If lanyards are to be used in the installation of Turner OCTO
®
System Scaffolds, rather than
Turner best and recommended practice using GuardAid
®
, then double lanyards must be
used.
The attachment points shown below must be used. Only use the specified attachment points.
At no point in the installation should you attach the lanyard to Guardrails or Horizontals. The
positions indicated below are shown and numbered for maximum resistance against fall.
Connections
1 - 6
On the vertical Standard directly above the decked level
on the inside or outside face of the scaffold
7 - 9
On the vertical Standard 1.0m above the deck (2nd cup
above deck level) on the outside face only
10 & 11
On the vertical Standard at 2.0m above working deck
(4th cup above deck level) but ONLY when a transverse
horizontal has been installed beforehand as shown in
diagram above