To assemble top lift only birdcage scaffolds,
remove Decks from the bays that do not
require to have a working platform below the
top lift (leaving ladder access bay in place).
Add Bracing Guardrails between outer and
inner Standards to provide protection to the
ladder access bay prior to removing Decks.
Remove Decks from the remaining bays
(from below).
Fit Toeboards.
(i) Linked Birdcage
Birdcage scaffolds can also be constructed by linking 2 runs of scaffolding using Bracing
Guardrails as the assembly procedure progresses until final lift height is achieved and the
full platform is completed.
The bay sizes and links can be
any OCTO
®
system modular
size from 0.7m to 3.5m.
Bay Length / Width ‘x-x’ = 0.70m to 3.50m
SECTION 1.5 Assembly Procedures