Independent Towers
Prior to the commencement of any scaffolding operations,
please refer to Sections
1.4.1 General Safety Notes
and
1.5
Assembly Procedures
.
(i) Fully Boarded
1. Base out structure
according to base out
procedure in Section
1.5.1
Tied Wall Scaffold Fully
Boarded
steps 1 to 11.
Note
Ensure that the entire
base is level and square before
proceeding with first lift height.
2. Place appropriate-sized
Decks (incl. ladder unit
to one side of tower),
Bracing Guardrails
and all Horizontals to
complete first lift safely.
3. Add additional and
appropriate-sized
Standards on top of
existing Standards to
allow placing of the next
lift of scaffolding.
4. Repeat placement of appropriate-sized
Decks, ladder access, Bracing Guardrails &
Horizontals to complete subsequent lifts.
6. Completed
Scaffold.
5. Fit Toeboards.
SECTION 1.5 Assembly Procedures