Turner OCTO
®
Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland
Section 1 Page 52
TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
5. Create hanging bay using Standards,
Bracing Guardrails, Horizontals,
Cantilever Brackets and Decks.
6. Tie outside Standards back to tower
structure using diagonal face braces.
7. Fit hanging Standards to complete the
bay and pin using high tensile M16
Nuts and Bolts.
8. Fit appropriate Bracing Guardrails,
Horizontals and Decks to complete
bay.
Ensure that a ladder access unit is fitted
to gain access to lower level.
9. Fit Toeboards.
10. Complete Scaffold.
SECTION 1.5 Assembly Procedures