Turner OCTO
®
Assembly Guide
©Turner Access Ltd 65 Craigton Road, Glasgow, G51 3EQ, Scotland
Section 1 Page 56
TA3/01/50/01_Iss1Rev3
Rev.No.Jan17/Rev3
SECTION 1.6 Anchoring
1.6.2
Tie Loads
Unclad Scaffold 24m x 1m with 0.7m (max) cantilevers; Load Class 3
CONfIgURATIONS
WIND lOAD CRITERIA
MAXIMUM
TIE lOADS
DESCRIPTION
C1 & C2
(kN)
C3 & C4
(kN)
bS EN 12810 - 1
EDGE
End standards > 2.0m from edge of building
3.1
2.9
•
South East England
EDGE(II)
End standards ≤ 2.0m from edge of building
6.2
5.8
•
Distance <100m from sea INTERIOR Any Internal standards
5.7
5.6
•
300m land altitude
TOP
Top platform level > 2.0m from eaves of building
3.0
3.0
•
Open Country
TOP(II)
Top platform level ≤ 2.0m from eaves of building
5.6
5.5
bS 6999 - 2
EDGE
End standards > 2.0m from edge of building
4.3
3.9
•
West of Scotland
EDGE(II)
End standards ≤ 2.0m from edge of building
8.4
7.7
•
Distance <100m from sea INTERIOR Any Internal standards
7.6
7.5
•
300m land altitude
TOP
Top platform level > 2.0m from eaves of building
4.0
3.8
•
Open Country
TOP(II)
Top platform level ≤ 2.0m from eaves of building
7.3
7.2
C1
C3
C2
C4
1000 CB060
Bracing guardrails &
Transoms @ 2.0m c/c
Max. 4.27m to first
Tie Location
Max. 24.0m
1000 CB060
1000 CB060
1000 CB060