Applications of smoke control methods
BAS-APG001-EN
7
Figure 4: Sample HVAC operation during smoke control
When an HVAC system serves only one smoke control zone, the following
sequence provides smoke control:
1.
In the smoke control zone, the return/exhaust fan activates, the
supply fan deactivates.
2.
The return air damper closes, and the exhaust damper opens
(optionally, the outside air damper closes).
3.
In the no-smoke zone, the return/exhaust fan deactivates, the supply
fan activates.
4.
The return air damper closes, and the outside air damper opens
(optionally, the exhaust air damper closes).
Stairwell smoke control
Stairwell smoke control uses pressurization to prevent smoke migration
through stairwells to floors remote from the source of the smoke.
Secondarily, it provides a staging area for fire fighters.
In the smoke control zone, a pressurized stairwell maintains a positive
pressure difference across closed stairwell doors to limit smoke
infiltration to the stairwell. Stairwell smoke control employs one or more
of these design techniques: compensated pressurization, non-
compensated pressurization, single injection pressurization, and multiple
injection pressurization.
Compensated pressurization technique
The compensated stairwell pressurization technique adjusts air pressure
to compensate for various combinations of open and closed stairwell
access doors. The technique maintains constant positive pressure
differences across openings. To compensate for pressure changes, it either
employs modulated supply airflow or over-pressure relief.
Note:
For simplicity, Figure 4 does not show the ducts on each floor or
the penthouse equipment.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......