BAS-APG001-EN
53
Chapter 5
Installing the Tracer MP581
programmable controller
Installation guidelines
Guidelines for installing a Tracer MP581 include:
•
A Tracer MP581 that monitors the fire alarm control panel for
consistency (FACP) must be installed in the same room as the FACP.
It must be installed within 20 feet of the FACP. Cables between the
FACP and the Tracer MP581 must be in conduit.
•
A Tracer MP581 that monitors and controls the fire smoke control
system (FSCS) must be installed in the same room as the FSCS. It
must be installed within 20 feet of the FSCS. Cables between the
FACP and Tracer MP581 must be in conduit.
▲
IMPORTANT
Wiring between the Tracer MP581 and the FACP and between the Tracer
MP581 and the FSCS (point wiring) must be in conduit. The conduit
requirement is necessary, since the binary inputs to the Tracer MP581
are not supervised.
•
Wiring from a Tracer MP581 to field sensors and relays is not
supervised. Installation of this wiring must conform to more stringent
requirements when a Tracer MP581 is part of a smoke control system
than when it is part of a standard mechanical system control.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......