Chapter 5 Installing the Tracer MP581 programmable controller
70
BAS-APG001-EN
Figure 36. Wiring binary outputs
Checking binary inputs
To check binary inputs for proper operation:
1.
Make sure that the sensor is connected and closed.
2.
Set the multi-meter to measure Vac, then measure the voltage across
the input connections at the signal and common screw terminals.
The measured voltage should be less than 0.1 Vac. If the voltage is
greater than this, the input readings may change erratically.
3.
Set the multi-meter to measure Vdc, then measure the voltage across
the input at the signal and common screw terminals.
The measured voltage should be less than 0.1 Vdc. If the voltage is
greater than this, the input readings may be offset.
CAUTION
Equipment damage!
Continue to step 4 only if you completed steps 2 and 3 successfully.
Measuring resistance may damage the meter if the voltage is too high.
4.
Set the multi-meter to measure resistance. If you completed steps 2
and 3 successfully, measure the resistance across the input.
The resistance should be less than 200
Ω
when the binary input is
closed and greater than 1 k
Ω
when it is open.
Powered output
< 1000 ft
(300 m)
< 1000 ft
(300 m)
Pilot relay
24 Vac coil
Signal
Common
Signal
Common
Tape back shield
NOTE: To reduce the potential for transients, locate output
devices in the same room with the Tracer MP581.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......