Chapter 5 Installing the Tracer MP581 programmable controller
60
BAS-APG001-EN
Wiring high-voltage power
WARNING
Hazardous voltage!
Before making electrical connections, lock open the supply-power dis-
connect switch. Failure to do so could result in death or serious injury.
CAUTION
Use copper conductors only!
Unit terminals are designed to accept copper conductors only. Other
conductors may cause equipment damage.
To connect high-voltage power wires:
1.
Lock open the supply-power disconnect switch.
2.
At the top right corner of the enclosure, remove the knockout and
install 0.5-inch (13 mm) conduit (see Figure 29).
Figure 29. Knockout for high-voltage power wires
3.
Open or remove the Tracer MP581 door if it is already installed.
4.
Inside of the enclosure at the top-right corner, remove the high-volt-
age area cover plate.
5.
Feed the high-voltage power wires into the enclosure.
6.
Connect the line wire to the L terminal as shown in Figure 30 on page
61.
7.
Connect the neutral wire to the N terminal.
8.
Connect the green ground wire to the chassis ground screw. The
ground wire must be continuous back to the circuit-breaker panel.
9.
Replace the cover plate.
Power wire entry through
knockout for 0.5-inch conduit
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......