Chapter 7 Programming
114
BAS-APG001-EN
information. A program fragment illustrating the collection process is
shown in Figure 65.
Figure 65. Collection of Tracer and EX2 communication status at an
individual MP581
Figure 65 also shows that each MP581 in the smoke control system
should send back its won watchdog signal to the main FSCP control
MP581.
At the main FSCP control MP581, all the communication status signals
are collected together to determine overall communication status.
Figure 66 on page 115 shows a TGP sample of the programming. Each
MP581 in the smoke control system sends its own watchdog signal, its
Tracer Summit communication status, and its EX-2 module
communication status. In addition, the main FSCP control MP581 will
have its own Tracer Summit communication status and EX-2 module
communication to determine and add to the calculation. The Comm Fault
LED should indicate if
any
communication link in the system is not
working correctly.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......