Variable-air-volume system
BAS-APG001-EN
119
Variable-air-volume system
For variable-air-volume (VAV) systems, some form of duct pressure relief
is required on each floor or in each smoke control zone. In smoke control
mode, all return and supply fans will be set to their highest speed. If the
VAV dampers are closed when this occurs, the duct pressure may be
enough to damage the ductwork. To avoid this possibility, duct pressure
relief dampers, either DDC or mechanically controlled, should be
installed in the ductwork for each smoke control zone.
It should be noted that careful sizing of smoke control supply air damper
and relief damper is necessary to use smoke purge and protect dampers.
Constant-volume system
For constant-volume systems in smoke control mode return/exhaust
dampers are open. Therefore, separate duct pressure relief is not
required, but may be necessary on each floor or in each smoke control
zone, as it is for VAV systems. Supply dampers should be sized such that
any one damper can spill an adequate amount of air.
UL-tested programs
This application guide showed only excerpts of UL-tested TGP programs.
Programs in their entirety can be found and downloaded from the GCS
Product Support Web site. These programs may or may not meet local
smoke alarm requirements. In all cases, defer to local smoke control
specifications.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......