This chapter provides considerations that must be given prior to
installing an engineered smoke control system. The pre-installation
considerations are:
•
Zone operating modes
•
Associated equipment
•
Equipment supervision
•
System testing
•
Alarm response
•
Automatic smoke control matrix
•
Response times
IMPORTANT
The local AHJ must approve the proposed system before installation
begins.
Zone operating modes
Zone operating modes are a pre-installation consideration. The design of
a building smoke control system is the responsibility of the building
architects and engineers. In the National Fire Protection Association
(NFPA) publication NFPA 101 (NFPA 2003,
Life Safety Code
), chapter
11.8 provides general high rise building requirements. Chapter 12–42
provides high-rise building requirements based on type of occupancy.
Both chapters may apply to a specific building.
Understanding the smoke control system operating modes enables the
effective layout of system controls. One of four operating modes governs
each zone: normal, alarm, adjacent, or unaffected.
Note:
In this chapter, the application of the smoke control system as a
zoned system is for general practice and conforms to national
codes and publications. In all cases, the local
authority having
jurisdiction
(AHJ) has the authority to modify requirements.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......