Chapter 4 Installing the Tracer Summit BMTX BCU
48
BAS-APG001-EN
Connecting the main circuit board
The main circuit board is attached to a plastic frame. It is shipped
separately. The board can be kept in the office and programmed while the
back of the enclosure is mounted and the termination board, which is
attached to the back of the enclosure, is wired. After programming has
been completed, connect the circuit board to the termination board as
shown in the following procedure.
To connect the circuit board:
1.
Verify that the 24 Vac power cable is not connected to the termination
board.
2.
Hold the circuit board frame at a 90° angle to the back of the
enclosure, as shown in Figure 21.
3.
Connect the circuit board’s 60-pin ribbon cable to the termination
board’s 60-pin slot. The connector is keyed to the slot. To avoid
difficulty, make sure that the key is lined up with the slot.
Figure 21. Connecting the circuit board ribbon cable
1.
Align the snaps on the circuit board frame with the mounting locks at
opposite ends of the enclosure back, as shown in Figure 22 on page 49.
2.
Using the tabs that are at both ends of the top frame, push the two
frames together. You will hear a click when the frames connect.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......