Applications of smoke control methods
BAS-APG001-EN
11
Natural smoke venting technique
The natural smoke venting technique employs vents in the atrium ceiling
or high on the atrium walls to let smoke flow out without the aid of fans
(Figure 8). The applicability of natural venting depends primarily on the
size of the atrium, the outside temperature, and the wind conditions.
When smoke is detected, all vents open simultaneously. The flow rate
through a natural vent depends on the size of the vent, the depth of the
smoke layer, and the temperature of the smoke.
Figure 8: Sample natural smoke venting technique
Smoke filling technique
The smoke filling technique allows smoke to collect at the ceiling. Without
fans to exhaust the smoke, the smoke layer grows thicker and descends.
Atrium smoke filling is viable when an atrium is of such size that the
time needed for the descending smoke to reach the occupants is greater
than the time needed for evacuation.
People movement calculations determine evacuation time. For
information on people-movement calculations, refer to SFPE 1995,
Fire
Protection Engineering Handbook
.
Note:
Thermally activated vents are not appropriate for natural
venting because of the time delay for opening.
Содержание Engineered Smoke Control System
Страница 1: ...BAS APG001 EN Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 2: ......
Страница 3: ...BAS APG001 EN September 2006 Applications Guide Engineered Smoke Control System for TRACER SUMMIT ...
Страница 6: ......
Страница 12: ...Contents vi BAS APG001 EN ...
Страница 30: ...Chapter 1 Smoke control overview 18 BAS APG001 EN ...
Страница 48: ...Chapter 3 Installation diagrams 36 BAS APG001 EN Figure 14 Tracer MP581 to FSCS wiring ...
Страница 50: ...Chapter 3 Installation diagrams 38 BAS APG001 EN Figure 15 Tracer MP581 to FACP wiring ...
Страница 57: ...Wiring high voltage ac power BAS APG001 EN 45 Figure 19 AC wiring ...
Страница 59: ...EMI RFI considerations BAS APG001 EN 47 Figure 20 Checking the earth ground ...
Страница 75: ...EMI RFI considerations BAS APG001 EN 63 Figure 31 Checking the earth ground ...
Страница 96: ...Chapter 5 Installing the Tracer MP581 programmable controller 84 BAS APG001 EN ...
Страница 104: ...Chapter 6 Installing the EX2 expansion module 92 BAS APG001 EN Figure 49 I O bus wiring example 2 ...
Страница 110: ...Chapter 6 Installing the EX2 expansion module 98 BAS APG001 EN ...
Страница 123: ...End process verification BAS APG001 EN 111 Figure 61 ast actuator fail checkb 3 13 06 ...
Страница 132: ...Chapter 7 Programming 120 BAS APG001 EN ...
Страница 151: ...Understanding bindings BAS APG001 EN 139 Figure 79 Mixed subnet node and group bindings ...
Страница 152: ...Chapter 8 Network variable bindings 140 BAS APG001 EN ...
Страница 154: ...Appendix A References 142 BAS APG001 EN ...
Страница 155: ......