
5.2 How to start
Unified Controller nv Series DeviceNet Module DN611B Instruction Manual
93
This section describes the sequence of powering on the slave devices, powering on the network, powering on
the controller, and starting the DN611B. Before performing this procedure, make sure that all wiring and
settings have been completed.
1
Turn ON the external power supply for DeviceNet network.
2
Turn ON the external power supply for the slave device and the load power supply for the slave
device.
3
Turn ON the controller unit
The “POWER” indicator LED of the power module lights up is green.
4
Set the operation mode switch of the controller module to "RUN"
Содержание DeviceNet nv Series
Страница 1: ...Unified Controller nv Series type1 light DeviceNetTM Module DN611B Instruction Manual 6F8C1686 ...
Страница 30: ...Chapter 1 DN611B Introduction 6F8C1686 14 ...
Страница 92: ...Chapter 4 Settings 6F8C1686 76 3 Register the slave node Figure 4 16 Register the slave node Drag and Drop ...
Страница 149: ...13 3 133 B Appendix B Outside Dimension ...
Страница 150: ...Appendix B Outside Dimension 6F8C1686 134 Figure B 1 External dimension 135 mm 35mm 130 mm 111 5mm 105mm ...
Страница 151: ...13 5 135 C Appendix C Related products C 1 Network components 136 C 2 DeviceNet setting tool 138 ...
Страница 159: ...1686 2 2201 ...