![ThermoFisher Scientific Ozone Primary Standard 49iQPS Скачать руководство пользователя страница 182](http://html1.mh-extra.com/html/thermofisher-scientific/ozone-primary-standard-49iqps/ozone-primary-standard-49iqps_instruction-manual_1105615182.webp)
Servicing
Step POL Board Replacement
6-26
49iQPS Instruction Manual
Thermo Scientific
Use the following procedure to replace the Step POL Board.
Equipment required:
Torque screwdriver, T15 or Slot screwdriver, 3/16
1.
Turn instrument OFF, unplug power cord, and remove the cover
(
Figure 2–1
).
2.
Unplug Step POL power cable J4.
3.
Unplug Step POL signal cable J2.
4.
Unplug pump cable J7.
5.
Unfasten captive hardware.
Figure 6–30.
Unplug and Unfasten Step POL Board
Step POL Board
Replacement
Содержание Ozone Primary Standard 49iQPS
Страница 1: ...49iQPS Instruction Manual Ozone Primary Standard 117434 00 1Apr2020...
Страница 2: ......
Страница 8: ......
Страница 31: ...Operation Instrument Display Thermo Scientific 49iQPS Instruction Manual 3 7...
Страница 142: ......
Страница 146: ...Maintenance Pump Rebuilding 4 4 49iQPS Instruction Manual Thermo Scientific Figure 4 2 Pump Rebuilding...
Страница 164: ...Servicing Fan Replacement 6 8 49iQPS Instruction Manual Thermo Scientific Figure 6 8 Replacing the Fan...
Страница 204: ...Servicing DMC Ozonator 6 48 49iQPS Instruction Manual Thermo Scientific Figure 6 55 Ozone DMC install pt 2...
Страница 208: ......
Страница 216: ......
Страница 234: ......
Страница 242: ......
Страница 254: ......
Страница 255: ......