2
Changing the Column
Replacing the Factory Installed Column
Thermo Scientific
TSQ 8000 Evo User Guide
19
9. Perform a column leak check:
a. On the TRACE 1310, select the
Leak Check
icon in the
Maintenance
menu.
Otherwise, perform the leak check through the Chromatography Data System. Refer
to the
TRACE 1300 and TRACE 1310 Series GC User Guide
for instructions.
b. Start the leak check.
The split and purge valves of the selected channel are automatically closed, and the
channel is pressurized with carrier gas to the leak check setpoint.
The system monitors the pressure for one minute. If the pressure does not drop more
than the maximum allowed sensitivity value, then the leak check will pass. If the leak
check does not pass, use the leak detector to find and fix any leaks.
c.
Repeat the leak check until no leaks are indicated.
10. Calibrate the carrier gas flow (column evaluation):
a. Carefully push the capillary column end into the flowmeter section of the column
flowmeter connector.
Figure 16.
Column Flowmeter Connector
b. Connect the flowmeter to the dedicated fitting on the column flowmeter connector.
c.
If you have a TRACE 1310, select the
Back
or
Front Column
icon in the
Configuration
menu. Otherwise, perform the column evaluation through the
Chromatography Data System. See the
TRACE 1300 and TRACE 1310 User Guide
for instructions.
Tip
Leaks can be caused by not tightening the fitting on the column flowmeter
connector. Check the fitting before looking for the leak elsewhere.
CAUTION INSTRUMENT DAMAGE:
Do not allow the column flowmeter
connector to exceed 80 °C (176 °F). Otherwise, it will melt and damage the
instrument.
A B C
To flowmeter
Содержание TSQ 8000
Страница 1: ...TSQ 8000 Evo Mass Spectrometer User Guide 1R120586 0002 Revision C December 2015 ...
Страница 22: ......
Страница 148: ......