Dionex Integral Systems Operator’s Manual
78
Doc. 065250-06 03/2020
5.9
AE Tower Light (Option)
When the optional Tower Light Kit (P/N 068549) is installed, a tower with four
lights is mounted on the top of the enclosure, on the left-hand side (see
To control the lights, the analyzer must include an SP with the optional SP TTL
and Relay Kit (P/N 068573). The SP relays are used to turn the lights on and off.
Each tower light color is controlled by a different relay output:
Lights can be configured to turn on whenever a particular error occurs. Use the
following methods to control the tower light relays:
•
In Chromeleon 7 PA, specify a relay to turn on a tower light if a hardware
alarm occurs. For example, have the red light turn on when a fatal hardware
alarm occurs.
Figure 5-9. AE Tower Light
Tower Light Color
Controlled by
Blue
Relay Out 1
Red
Relay Out 2
Yellow
Relay Out 3
Green
Relay Out 4
Tower Light
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...