Dionex Integral Systems Operator’s Manual
194
Doc. 065250-06 03/2020
7. Close and secure the SP service door.
8. If you removed the SP from the AE rear panel:
a.
Lift up the SP, align the four hooks on the rear of the SP with the
mounting rails on the AE rear panel, and hang the SP on the rails.
b. Replace any modules that were removed from the lower shelf of
the AE.
c.
Replace the two access panels on the exterior of the AE.
9. Plug in the power cord and turn on the power.
10. Open the Chromeleon 7 Instrument Configuration Manager and open
the SP
Properties
dialog box. The
LiquidLevelSensor_1
check box
(or
LiquidLevelSensor_2
, and so on) is enabled on the
Sensors
page.
11. Save the configuration.
Figure F-5. Main SP Electronics Board (Vertical Enclosure Shown):
Liquid Level Sensor Connectors
Connectors for four
liquid level sensors
1
2
4
3
Cable from liquid
level sensor 1
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...