Operation
Calibration
3-14
48iQ Instruction Manual
Thermo Scientific
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
●
Zero/Span Schedule:
Toggles zero/span schedule Enabled or Disabled.
●
Next Time:
Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
●
Period:
Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
●
Zero Duration:
Sets how long zero air is sampled by the instrument.
●
Span Duration:
Sets how long span gas is sampled by the instrument.
●
Purge Duration:
Sets how long the purge period will be at the end of
the schedule.
Zero/Span Schedule
Содержание 117080-00
Страница 1: ...48iQ Instruction Manual Carbon Monoxide Analyzer 117080 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 28: ......
Страница 36: ...Operation Instrument Display 3 8 48iQ Instruction Manual Thermo Scientific ...
Страница 154: ......
Страница 165: ...Calibration Calibration Thermo Scientific 48iQ Instruction Manual 4 11 ...
Страница 174: ...Maintenance Pump Rebuilding 5 4 48iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 184: ......
Страница 192: ...Servicing Fan Replacement 7 8 48iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 220: ...Servicing DMC Optical Bench 7 36 48iQ Instruction Manual Thermo Scientific Figure 7 40 Filter Wheel ...
Страница 230: ...Servicing DMC Optical Bench 7 46 48iQ Instruction Manual Thermo Scientific Figure 7 48 IR Source Cable Disconnect ...
Страница 252: ......
Страница 278: ......
Страница 290: ......
Страница 291: ......