Installation and Setup
Setup Procedure
Thermo Scientific
48iQ Instruction Manual
2-7
5.
If the optional zero/span solenoid valves are installed, connect a source
of CO-free air to the ZERO IN bulkhead, and connect a source of CO
span gas to the SPAN bulkhead.
6.
Connect a suitable recording device to the rear panel connector. For
detailed information about connecting to the instrument, refer to:
“
Connecting External Devices
” on page
9-1
Communications > “
Analog I/O
” on page
3-57
, and “
Digital I/O
”
on page
3-59
.
7.
Plug the instrument into an outlet of the appropriate voltage and
frequency.
The 48iQ is supplied with a three-wire grounding cord. Under no
circumstances should this grounding system be defeated.
▲
Figure 2–5.
48iQ Rear Panel
Icon Here
Содержание 117080-00
Страница 1: ...48iQ Instruction Manual Carbon Monoxide Analyzer 117080 00 1Sep2019 ...
Страница 2: ......
Страница 18: ......
Страница 28: ......
Страница 36: ...Operation Instrument Display 3 8 48iQ Instruction Manual Thermo Scientific ...
Страница 154: ......
Страница 165: ...Calibration Calibration Thermo Scientific 48iQ Instruction Manual 4 11 ...
Страница 174: ...Maintenance Pump Rebuilding 5 4 48iQ Instruction Manual Thermo Scientific Figure 5 2 Pump Rebuilding ...
Страница 184: ......
Страница 192: ...Servicing Fan Replacement 7 8 48iQ Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 220: ...Servicing DMC Optical Bench 7 36 48iQ Instruction Manual Thermo Scientific Figure 7 40 Filter Wheel ...
Страница 230: ...Servicing DMC Optical Bench 7 46 48iQ Instruction Manual Thermo Scientific Figure 7 48 IR Source Cable Disconnect ...
Страница 252: ......
Страница 278: ......
Страница 290: ......
Страница 291: ......