Operating Instructions
6-26
Post Load Procedure
1. Make sure all the doors are closed and locked.
2. Make sure the setpoint is at the desired setting.
3. Start the unit.
4. A half hour after loading, defrost the unit by manually initiating a defrost cycle. If the evaporator coil temperature is below
7 C (6 C on units with a TG-V controller; 3 C on units with a TG-IV controller), the unit will defrost. The defrost cycle should
terminate automatically.
TG-VI, MT µP-V AND µP-VI NOTE: A manual defrost function is built into the controller. Press SELECT key (MODE key
on µP-VI) (MANUAL DEFROST key on SR-2/SR-3) to scroll to the dEF screen in the menu display. Then press the ENTER
key to initiate Defrost. The display will briefly show Lod (load) and enter Defrost.
Post Trip Inspection
1. Wash the unit.
2. Check for fluid leaks.
3. Check for loose or missing hardware.
4. Check for physical damage to the unit.
Содержание SLXi Spectrum
Страница 17: ...Safety Precautions 2 5 Warning Decals...
Страница 18: ...Safety Precautions 2 6 Warning Decals Information Decals...
Страница 74: ...Unit Description 5 30...
Страница 128: ...Controller Operation 7 28...
Страница 156: ...Electrical Maintenance 8 28...
Страница 177: ...Engine Maintenance 9 21 Integral Fuel Solenoid Components 1 Integral Fuel Solenoid 2 O ring 3 Fuel Injection Pump Groove...
Страница 234: ...Refrigeration Maintenance 10 22...
Страница 309: ...13 Mechanical Diagnosis TK 482 TK 486 and TK 486V Engines 13 2...
Страница 316: ...Mechanical Diagnosis 13 8...
Страница 322: ...Refrigeration System Diagnosis 14 6...
Страница 332: ...Single Temperature Refrigeration System Diagrams 15 10...
Страница 339: ...Multi Temperature Refrigeration System Diagrams 16 7...
Страница 340: ...Multi Temperature Refrigeration System Diagrams 16 8...
Страница 342: ...Wiring Diagrams and Wiring Schematics 17 2...