
LLZ 421
Operation and Maintenance
Alignment Procedure LLZ−1F (Dip./Refl.)
ILS 420
4−1
Ed. 01.10
SOAC
CHAPTER 4
ALIGNMENT PROCEDURE LLZ−1F (14E)
MEDIUM APERTURE ANTENNA
The alignment procedure of a LLZ−1F using the Dipole/Reflector antenna system with 14 elements
including prerequisites is described in a step by step way starting with 4.1. For the previously used
12 elements system, an individual Product Info is available. The following list is a summary and also
a detailed table of contents. For LPD−antenna refer to Chapter 7.
GENERAL PREREQUISITES
Operation via Personal Computer
4.1.1.1 PC with MCS User Program
4.1.1.2 PC with ADRACS User Program
4.1.2
Recommended Measuring Equipment
Installation
FIRST SWITCHING ON
Status of the System
4.2.1.1 Special Jumper Settings before Start Up
4.2.2
Switch On
General Remarks to the PC User Program Handling
Preparing the Installation SITE with PC
4.2.4.1 Use of MCS
4.2.4.2 Use of ADRACS
4.2.5
Check and Enter Station Configuration Data
SETTING OF TRANSMITTER AND ANTENNA
Adjusting CRS CSB Signal
Set CSB/SBO Phase
Check SBO null of Course Antenna
Course Width
Measure Course Position at the Threshold
Performing Ground Check on Measurement Circle
SETTING THE MONITORS
Adjustment Procedure of Aerial Channels
4.4.1.1 CRS Posn. Channel
4.4.1.2 CRS Width Channel
4.4.1.3 NFM Channel
4.4.2
Adjustment Procedure of Standby Channels
4.4.2.1 Standby CRS Posn. Channel
4.4.2.2 Standby CRS Width Channel
4.4.3
Calibration and Normalization of Integral Monitors
4.4.3.1 Integral Monitoring Posn. (DDM 0 %)
4.4.3.2 Integral Monitoring Width (DDM 15.5 %)
4.4.3.3 Adjustment of Position Nearfield Monitor, optional
4.4.4
Calibration and Normalization of Standby Monitors
4.4.4.1 Course Position Standby Monitor
4.4.4.2 Course Width Standby Monitor
4.4.5
Set Alarm Limits and Alarm Delays
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...