
LLZ 421
Operation and Maintenance
Alignment Procedure LLZ−2F (Dip./Refl.)
ILS 420
5−1
Ed. 07.08
SOAC
CHAPTER 5
ALIGNMENT PROCEDURE LLZ−2F (13E, 21E)
MEDIUM− AND WIDE−APERTURE DIPOLE/REFLECTOR ANTENNA
The alignment procedure of a LLZ−2F using the dipole/reflector antenna system with 13 or 21 ele-
ments including prerequisites is described in a step by step manner starting with 5.1. The following
list is a summary and also a detailed table of contents. For LPD−antenna refer to Chapter 8.
GENERAL PREREQUISITES
Operation via Personal Computer
PC with MCS User Program
PC with ADRACS User Program
Recommended Measuring Equipment
5.1.3
Installation
FIRST SWITCHING ON
Status of the System
Special Jumper Settings before Start Up
Switching On
General Remarks to the PC User Program Handling
Preparing the Installation SITE with PC
Use of MCS
Use of ADRACS
Check and Enter Station Configuration Data
SETTING THE TRANSMITTER AND ANTENNA
Adjusting CRS CSB Signal
Adjusting CLR CSB Signal
Set CSB/SBO Phase (Course)
Set CSB/SBO Phase (Clearance)
Check SBO Null of Course Antenna
Set Course SBO Amplitude (Course Width)
Set Clearance SBO Amplitude
Set and Check Capture Ratio
Measure Course Position at Threshold
Performing Ground Check on Measurement Circle
SETTING THE MONITORS
Adjustment Procedure of Aerial Channels
CRS Posn. Channel
CRS Width Channel
CLR Width (1) Channel
NFM Channel
Adjustment Procedure of Standby Channels
StbyCRS Posn. Channel
Stby CRS Width Channel
Stby CLR Width Channel
Calibration and Normalization of Integral Monitors
Integral Monitoring Posn. (DDM 0 %)
Integral Monitoring Width (DDM 15.5 %), optional
Clearance Width Monitor
Position Nearfield Monitor
Calibration and Normalization of Standby Monitors
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...