
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−11
Ed. 01.04
SOAC
L1
L2
L3
N
PE
rear side of transmitter rack, BP−PS
BAT BAT
+B −B
5
bottom plate with
cable glands
mains connection box
shelter
230 VAC
ÂÂÂ
ÂÂÂ
transmitter rack
FPE
(european version only)
C−bar
battery terminal
measuring line
connector
DME
terminal
RL
terminal
mains terminal
mains terminal
mains filter
emergency battery
battery box
48 V
+
−
fuse box
BFUSE
BFUSE
BAT2
BAT1
BAT0
50 A
0.2 A
DC
F20
F21
1
2
3
4
24
23
2 1
F
F
0
−N
+N
PE
N
L1
L2
L3
L3
L2
N
L1
PE
L1
N
L2
L3
L3
L2
L1
N
L2
L3
N
L1
PE
connectors position:
IN
OUT
LVS
X10
X8
X9
X4
DCC−5
X2
X3
−A
+A
F4
F5
REL1
SP26
SP10
TX1
to S1 (TX1)
to S2 (TX2)
TX2
from S2
from S1
DME+
−D
+D
−R
+R
DME−
DC to TX
P54 LG−A
Ubat −
P15 TX2
P5 TX2
N15 TX2
GND TX1_1
GND TX1_2
GND TX2_2
GND TX2_1
P24 TX2
P15 INTFC
P15 TX1
P5 INTFC
P5 TX1
N15 TX1
N15 INTFC
P24 TX1
Assignment DC to TX1/2
to REL1
to LCP
to GND
from LVS
54+
factory wired
54+
Ground bolt
N_1
L2_1
not used
not used
to Shelter ground
(regard NOTE)
NOTE:
As special option a 2 phase mains connection
(e.g. L1, L2) may be established for individual
supply of AC/DC converter. In this case the
standard bridge between L1 and L2 at the
mains terminal has to be removed.
Fig. 2−13
Connections at the backpanel BP−PS, C−bar and bottom plate
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...