LLZ 421
Operation and Maintenance
Maintenance
ILS 420
6−13
Ed. 01.10
SOAC
− Set the desired voltage carefully at the potentiometer on the front panel with the aid of a calibration
screwdriver. It should be possible to obtain the value specified in the table in 6.3.3.1 to within a
tolerance of ±0.2 V.
− Switch off the adjusted ACC unit.
− Switch on the next ACC unit and adjust it in the same way.
− Adjust all installed ACC units in the same way.
When all units have been set in this way measurements should be performed as follows:
− Disconnect the battery.
− Perform measurement bBAT and −BAT on the BCPS terminal plate using a digital volt-
meter:
First measurement
: Transmitter off, BCPS without load
Second measurement :
Transmitter on, BCPS with load
The values should not deviate from the set value by more than ±1 %. If the deviation is greater, the
relevant module can be determined by deactivating the power units individually and observing the
voltage change. The voltage of this unit must then be corrected upwards or downwards. The BCPS
is then ready for service.
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...