
LLZ 421
Operation and Maintenance
Alignment Procedure LLZ−1F (LPD)
ILS 420
7−17
Ed. 07.08
SOAC
7.5
BATTERY MONITORING
If emergency batteries are available, the battery voltage can be monitored to avoid over discharge
of batteries. For this purpose a warning level can be set and a low level limit can be set.
NOTE:
A battery switch off to avoid deep discharge is executed via the separate LVS−circuit and
the relays located on the BP−PS subrack.
a) Open dialog ’LRCI − Environmental Setup’.
b) Enable ’Battery Low Monitoring’ by selecting ’Alarm Maint. Alert’ or ’Alarm Degradation’
.
NOTE:
’
Alarm Maint. Alert’ means indication only, ’Alarm Degradation’ means action
.
c) Set ’Battery Warning Level’ to e.g. 46.0 V.
NOTE:
Setting range: 40 to 50 V.
d) Set ’TX off if battery lower than’ to e.g. 44.0 V.
NOTE:
Setting range: 40 to 50 V.
7.6
NORMAL OPERATION
a) Switch both TX on and set TX1 on aerial.
b) Check that no MONITOR ALARM or TX WARNING is on, otherwise locate and eliminate the fault.
c) Set TX2 on aerial.
d) Check that no MONITOR ALARM or TX WARNING is on, otherwise locate and eliminate the fault.
e) Set TX1 on aerial.
f) Set all Monitor Bypass off.
NOTE:
NORMAL should light up in MAIN STATUS field.
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...