d) Open dialog ’Transmitter1−Waveform Data#1’. Note down the values of ’CRS SBO Amplitude’.
Set it to 0.
e) Send to Monitor1/2 the command ’Calibration, Executive Nearfield Pos. detector’ (or ’Executive
Ch. 4 Width detector’).
f) Restore TX1 SBO settings of 7.4.3.3 d) back to normal.
g) Send to Monitor1/2 the command ’Normalization, Executive Nearfield Pos. detector’ (or ’Executive
Ch. 4 Width detector’).
7.4.4
Calibration and Normalization of Standby Monitors
NOTE:
Before performing this procedure it is recommended to check alarm limits acc. 7.4.5.
a) Switch TX 2 on.
7.4.4.1
COURSE POSITION STANDBY Monitor
a) RF−level of the corresponding path on the SOAC (Fig. 7−2, 7−3) is set to amplitude of 3.6 Vpp
b) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
values for ’Stby CRS Position DDM’ and ’Stby CRS Position SDM’.
c) Open dialog ’Transmitter2−Waveform Data#1’. Note down the values of ’CRS SBO Amplitude’
of Standby TX (TX2). Set it to 0.
d) Send to Monitor1/2 the command ’Calibration, Standby CRS Position Detector.
e) Restore TX2 SBO settings of 7.4.4.1 c) back to normal.
f) Send to Monitor1/2 the command ’Normalization, Standby CRS Position Detector.
7.4.4.2
COURSE WIDTH STANDBY Monitor
a) RF−level of the corresponding path on the SOAC (Fig. 7−2, 7−3) is set to amplitude of 3.6 Vpp
b) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
value for ’Stby CRS WIDTH DDM’.
c) Open dialog ’Transmitter2−Waveform Data#1’. Note down the values of ’CRS SBO Amplitude’
of Standby TX (TX2). Set it to 0.
d) Send to Monitor1/2 the command ’Calibration, Standby CRS Width detector’.
e) Restore TX2 CSB and SBO settings of 7.4.4.2 c) back to normal.
f) Check and set DDM indication to 15.5 % with R25.
g) Send to Monitor1/2 the command ’Normalization, Standby CRS Width detector’.
h) Set ’Ident keying’ of both transmitters to ’keyed’ again.
NOTE:
If it is not set, the monitor indicates green, but the TX may perform a shutdown after about 10 s.
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...