
LLZ 421
Operation and Maintenance
Operation
ILS 420
3−3
Ed. 01.07
SOAC
3.3
CONTROLS AND INDICATORS ON THE SUBASSEMBLIES
See Fig. 3−2.
The controls and indications of individual subassemblies are shown in Fig. 3−2.
Board
Indicator
Color
Control
Function of control or indicator (lit or flashing)
LG−A
CPU_NORM
Audio_On
green
green
Reset
Load/Boot
flashing slowly (1 Hz) board ok
off
board faulty or TX shutdown
lit
TX on, generating nav. signals
flashing slowly TX off, not generating signals
flashing fast
program state faulty
off
TX shutdown
performs a reset of the processor board
Used with Reset, to prepare the board for
software load procedure, both LED are lit.
During load procedure both LED are flashing.
LG−M
CPU_NORM
Audio_On
green
green
Reset
Load/Boot
lit
monitor program stopped
flashing slowly (1 Hz) board ok, monitor runs
off
board faulty or TX shutdown
lit
TX on
flashing
normal operation, indic. meas-
urement chain repetition rate
flashing fast
program state faulty
off
monitor is not operating or TX
shutdown
performs a reset of the processor board
Used with Reset, to prepare the board for
software load procedure, both LED are lit.
During load procedure both LED are flashing.
ECU
LED indicators
top down
green
yellow
red
red
green
yellow
red
red
yellow
red
red
green
red
red
red
Lit if:
Executive TX on
Executive Monitor bypass on
Executive Alarm Monitor 1
Executive Alarm Monitor 2
Standby TX on
Standby Monitor bypass on
Standby Alarm Monitor 1
Standby Alarm Monitor 2
Field monitor bypass on
Field Alarm Monitor 1
Field Alarm Monitor 2
Equipment 1 Executive
3rd redundant detection path off; safety shutd.
Integrity fail:integritytest of monitors has failed
Switch fail: switching action failed
(flashing: missing subassemblies/HW)
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...